Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/08/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 103,714.19 103,714.19
2 10/04/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 110,014.02 110,014.02
3 11/25/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 34,739.54 34,739.54
4 04/01/2025 Audit 0.00 0.00 0.00 0.00 0.00 0.00 15,032.25 15,032.25
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 263,500.00 263,500.00