Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/13/2025 Payment 0.00 0.00 14,292.00 0.00 0.00 0.00 0.00 14,292.00
2 04/09/2025 Payment 0.00 0.00 11,286.72 0.00 0.00 0.00 0.00 11,286.72
TOTAL PAYMENTS 0.00 0.00 25,578.72 0.00 0.00 0.00 0.00 25,578.72