Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/04/2024 Payment 0.00 0.00 0.00 0.00 28,656.24 1,991.47 0.00 30,647.71
2 12/04/2024 Payment 0.00 0.00 0.00 0.00 1,813.43 112,448.83 0.00 114,262.26
3 01/23/2025 Payment 0.00 0.00 0.00 0.00 966.70 0.00 0.00 966.70
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 31,436.37 114,440.30 0.00 145,876.67