Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/07/2025 Payment 0.00 0.00 0.00 0.00 7,048.43 612.19 103,702.18 111,362.80
2 06/30/2025 Audit 0.00 0.00 0.00 0.00 -1,071.50 -612.19 7,544.89 5,861.20
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 5,976.93 0.00 111,247.07 117,224.00