Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/13/2024 Payment 0.00 0.00 40,647.48 0.00 36,025.26 0.00 461,744.66 538,417.40
2 04/01/2025 Audit 0.00 0.00 2,919.55 0.00 7,335.07 190.72 15,010.26 25,455.60
TOTAL PAYMENTS 0.00 0.00 43,567.03 0.00 43,360.33 190.72 476,754.92 563,873.00