Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/01/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 131,006.40 131,006.40
2 11/21/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 149,497.39 149,497.39
3 12/30/2024 Audit 0.00 0.00 0.00 0.00 2,581.19 0.00 113,392.02 115,973.21
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 2,581.19 0.00 393,895.81 396,477.00