Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/20/2024 Payment 0.00 0.00 0.00 0.00 11,986.96 0.00 85,865.75 97,852.71
2 10/22/2024 Payment 0.00 0.00 0.00 0.00 5,348.00 0.00 76,831.12 82,179.12
3 11/27/2024 Payment 0.00 0.00 0.00 0.00 2,541.56 0.00 13,951.30 16,492.86
4 01/22/2025 Payment 0.00 0.00 0.00 0.00 3,004.31 0.00 2,714.60 5,718.91
5 02/14/2025 Audit 0.00 0.00 0.00 0.00 -1,666.01 0.00 12,310.41 10,644.40
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 21,214.82 0.00 191,673.18 212,888.00