Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/30/2024 Payment 0.00 0.00 0.00 0.00 0.00 19,942.29 0.00 19,942.29
2 01/29/2025 Audit 0.00 0.00 0.00 0.00 3,197.17 -19,942.29 19,942.83 3,197.71
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 3,197.17 0.00 19,942.83 23,140.00