Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 10/31/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 325,025.09 325,025.09
2 01/24/2025 Final 0.00 0.00 0.00 0.00 81,874.42 0.00 85,521.49 167,395.91
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 81,874.42 0.00 410,546.58 492,421.00