Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/01/2025 Audit 0.00 0.00 0.00 0.00 11,764.65 0.00 58,822.35 70,587.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 11,764.65 0.00 58,822.35 70,587.00