Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/11/2025 Payment 0.00 0.00 0.00 0.00 4,487.79 0.00 36,002.87 40,490.66
2 03/17/2025 Audit 0.00 0.00 0.00 0.00 2,988.21 0.00 36,101.13 39,089.34
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 7,476.00 0.00 72,104.00 79,580.00