Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/13/2024 Payment 0.00 0.00 5,146.28 0.00 0.00 0.00 0.00 5,146.28
2 12/06/2024 Payment 0.00 0.00 42,382.73 0.00 0.00 0.00 0.00 42,382.73
3 02/27/2025 Audit 0.00 0.00 -42,382.57 0.00 6,973.65 0.00 103,451.91 68,042.99
TOTAL PAYMENTS 0.00 0.00 5,146.44 0.00 6,973.65 0.00 103,451.91 115,572.00