Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/05/2025 Payment 0.00 0.00 0.00 0.00 1,088.29 0.00 38,315.81 39,404.10
2 03/26/2025 Audit 0.00 0.00 0.00 0.00 1,291.01 0.00 79,824.89 81,115.90
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 2,379.30 0.00 118,140.70 120,520.00