Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/03/2025 Payment 0.00 0.00 6,711.81 0.00 0.00 0.00 0.00 6,711.81
2 02/28/2025 Payment 0.00 0.00 8,597.90 0.00 0.00 0.00 0.00 8,597.90
3 04/04/2025 Payment 0.00 0.00 12,685.65 0.00 0.00 0.00 0.00 12,685.65
TOTAL PAYMENTS 0.00 0.00 27,995.36 0.00 0.00 0.00 0.00 27,995.36