Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/18/2025 Payment 0.00 0.00 10,499.94 0.00 0.00 0.00 0.00 10,499.94
2 03/11/2025 Payment 0.00 0.00 10,502.00 0.00 0.00 0.00 0.00 10,502.00
3 04/10/2025 Payment 0.00 0.00 11,307.63 0.00 0.00 0.00 0.00 11,307.63
TOTAL PAYMENTS 0.00 0.00 32,309.57 0.00 0.00 0.00 0.00 32,309.57