Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/14/2025 Payment 0.00 0.00 5,540.78 0.00 0.00 0.00 0.00 5,540.78
TOTAL PAYMENTS 0.00 0.00 5,540.78 0.00 0.00 0.00 0.00 5,540.78