Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/15/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 143,949.58 143,949.58
2 12/17/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 178,484.11 178,484.11
3 03/17/2025 Audit 0.00 0.00 114,000.00 0.00 57,000.00 0.00 3,302.31 174,302.31
TOTAL PAYMENTS 0.00 0.00 114,000.00 0.00 57,000.00 0.00 325,736.00 496,736.00