Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/04/2025 Payment 0.00 0.00 0.00 0.00 0.00 0.00 148,170.31 148,170.31
2 03/25/2025 Payment 0.00 0.00 0.00 0.00 0.00 0.00 170,352.05 170,352.05
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 0.00 318,522.36 318,522.36