Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/22/2024 Payment 0.00 0.00 75,548.32 0.00 0.00 0.00 0.00 75,548.32
2 10/16/2024 Payment 0.00 0.00 16,528.66 0.00 0.00 0.00 189,727.88 206,256.54
3 12/04/2024 Payment 0.00 0.00 0.00 0.00 0.00 0.00 239,469.23 239,469.23
4 01/07/2025 Payment 0.00 0.00 0.00 0.00 67,041.81 0.00 313,192.27 380,234.08
TOTAL PAYMENTS 0.00 0.00 92,076.98 0.00 67,041.81 0.00 742,389.38 901,508.17