Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/12/2025 Payment 0.00 0.00 18,358.47 0.00 0.00 0.00 0.00 18,358.47
2 03/13/2025 Payment 0.00 0.00 12,238.98 0.00 0.00 0.00 0.00 12,238.98
TOTAL PAYMENTS 0.00 0.00 30,597.45 0.00 0.00 0.00 0.00 30,597.45