Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/25/2025 Payment 0.00 0.00 13,325.72 0.00 0.00 0.00 0.00 13,325.72
2 03/14/2025 Payment 0.00 0.00 14,806.34 0.00 0.00 0.00 0.00 14,806.34
TOTAL PAYMENTS 0.00 0.00 28,132.06 0.00 0.00 0.00 0.00 28,132.06