Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/22/2025 Payment 0.00 0.00 0.00 0.00 4,668.32 0.00 26,128.44 30,796.76
2 03/13/2025 Payment 0.00 0.00 0.00 0.00 668.19 0.00 0.00 668.19
3 04/01/2025 Audit 0.00 0.00 3,657.54 0.00 307.15 0.00 3,710.36 7,675.05
TOTAL PAYMENTS 0.00 0.00 3,657.54 0.00 5,643.66 0.00 29,838.80 39,140.00