Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/26/2024 Payment 0.00 0.00 34,646.10 0.00 9,397.77 0.00 0.00 44,043.87
2 12/30/2024 Payment 0.00 0.00 0.00 0.00 11,539.55 0.00 218,416.40 229,955.95
TOTAL PAYMENTS 0.00 0.00 34,646.10 0.00 20,937.32 0.00 218,416.40 273,999.82