Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/26/2024 Payment 0.00 0.00 34,646.10 0.00 9,397.77 0.00 0.00 44,043.87
2 12/30/2024 Payment 0.00 0.00 0.00 0.00 11,539.55 0.00 218,416.40 229,955.95
3 03/04/2025 Payment 0.00 0.00 38.53 0.00 1,971.29 0.00 19,414.30 21,424.12
TOTAL PAYMENTS 0.00 0.00 34,684.63 0.00 22,908.61 0.00 237,830.70 295,423.94