Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/30/2024 Payment 0.00 0.00 1,306.59 0.00 0.00 0.00 0.00 1,306.59
2 10/15/2024 Payment 0.00 0.00 762.82 0.00 0.00 0.00 0.00 762.82
3 12/26/2024 Payment 0.00 0.00 682.79 0.00 0.00 0.00 0.00 682.79
4 01/28/2025 Payment 0.00 0.00 318.01 0.00 0.00 0.00 0.00 318.01
5 03/17/2025 Payment 0.00 0.00 490.55 0.00 0.00 0.00 0.00 490.55
TOTAL PAYMENTS 0.00 0.00 3,560.76 0.00 0.00 0.00 0.00 3,560.76