Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/27/2025 Payment 0.00 0.00 0.00 0.00 86,978.01 3,697.36 393,261.30 483,936.67
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 86,978.01 3,697.36 393,261.30 483,936.67