Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/02/2024 Payment 0.00 0.00 0.00 0.00 202,550.53 0.00 526,177.27 728,727.80
2 11/14/2024 Payment 0.00 0.00 0.00 0.00 84,918.48 0.00 384,688.47 469,606.95
3 05/15/2025 Audit 0.00 0.00 0.00 0.00 -120,579.52 0.00 183,649.77 63,070.25
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 166,889.49 0.00 1,094,515.51 1,261,405.00