Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/02/2024 Payment 0.00 0.00 0.00 0.00 202,550.53 0.00 526,177.27 728,727.80
2 11/14/2024 Payment 0.00 0.00 0.00 0.00 84,918.48 0.00 384,688.47 469,606.95
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 287,469.01 0.00 910,865.74 1,198,334.75