Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/26/2024 Payment 0.00 0.00 5,135.89 0.00 0.00 0.00 0.00 5,135.89
2 01/22/2025 Payment 0.00 0.00 35,085.20 0.00 0.00 0.00 0.00 35,085.20
TOTAL PAYMENTS 0.00 0.00 40,221.09 0.00 0.00 0.00 0.00 40,221.09