Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 01/29/2025 Audit 0.00 0.00 0.00 0.00 22,303.12 0.00 527,696.88 550,000.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 22,303.12 0.00 527,696.88 550,000.00