Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/26/2024 Payment 0.00 0.00 0.00 130,723.43 0.00 0.00 0.00 130,723.43
2 01/13/2025 Payment 0.00 0.00 0.00 49,259.03 0.00 0.00 0.00 49,259.03
TOTAL PAYMENTS 0.00 0.00 0.00 179,982.46 0.00 0.00 0.00 179,982.46