Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/12/2024 Payment 0.00 0.00 0.00 0.00 0.00 1,189.51 0.00 1,189.51
2 10/04/2024 Payment 0.00 0.00 0.00 0.00 30,619.71 215.88 127,787.50 158,623.09
3 12/12/2024 Payment 0.00 0.00 0.00 0.00 33,994.64 568.86 157,865.26 192,428.76
4 02/25/2025 Payment 0.00 0.00 0.00 0.00 16,848.08 0.00 86,683.35 103,531.43
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 81,462.43 1,974.25 372,336.11 455,772.79