Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/27/2025 Payment 0.00 0.00 12,411.90 0.00 0.00 0.00 0.00 12,411.90
2 06/06/2025 Payment 0.00 0.00 19,523.86 0.00 0.00 821.31 0.00 20,345.17
3 08/19/2025 Payment 0.00 0.00 0.00 0.00 5,764.16 0.00 0.00 5,764.16
4 01/05/2026 Audit 0.00 0.00 1,357.52 0.00 38,317.75 -821.31 686,776.81 725,630.77
TOTAL PAYMENTS 0.00 0.00 33,293.28 0.00 44,081.91 0.00 686,776.81 764,152.00