Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/07/2024 Payment 0.00 0.00 0.00 0.00 15,138.54 0.00 450,271.74 465,410.28
2 04/08/2025 Payment 0.00 0.00 0.00 0.00 487,732.04 0.00 1,403,428.08 1,891,160.12
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 502,870.58 0.00 1,853,699.82 2,356,570.40