Bill # | Payment Date | Type | Predesign | Spec. Study | DE Engr. | Right of Way | CN Engr. | CN Other | CN Contract | Total |
---|---|---|---|---|---|---|---|---|---|---|
1 | 09/05/2024 | Payment | 0.00 | 0.00 | 97,568.20 | 0.00 | 0.00 | 0.00 | 0.00 | 97,568.20 |
TOTAL PAYMENTS | 0.00 | 0.00 | 97,568.20 | 0.00 | 0.00 | 0.00 | 0.00 | 97,568.20 |