Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/01/2024 Payment 0.00 0.00 7,279.00 0.00 0.00 117.25 50,059.36 57,455.61
2 12/10/2024 Payment 0.00 0.00 0.00 0.00 4,295.34 0.00 0.00 4,295.34
3 01/21/2025 Audit 0.00 0.00 -7,279.00 0.00 3,457.67 -117.25 3,634.63 -303.95
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 7,753.01 0.00 53,693.99 61,447.00