Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 07/10/2024 Payment 0.00 0.00 0.00 0.00 133,842.45 0.00 168,447.89 302,290.34
2 09/20/2024 Payment 0.00 0.00 0.00 0.00 26,829.17 0.00 19,585.61 46,414.78
3 05/15/2025 Audit 0.00 0.00 79,055.85 0.00 -42,457.79 0.00 74,118.82 110,716.88
TOTAL PAYMENTS 0.00 0.00 79,055.85 0.00 118,213.83 0.00 262,152.32 459,422.00