Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/14/2024 Audit 0.00 0.00 17,415.00 0.00 23,217.00 0.00 125,666.00 166,298.00
TOTAL PAYMENTS 0.00 0.00 17,415.00 0.00 23,217.00 0.00 125,666.00 166,298.00