Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/11/2024 Payment 0.00 0.00 48,951.10 0.00 0.00 0.00 0.00 48,951.10
TOTAL PAYMENTS 0.00 0.00 48,951.10 0.00 0.00 0.00 0.00 48,951.10