Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/21/2024 Payment 0.00 0.00 14,086.37 0.00 0.00 0.00 0.00 14,086.37
2 10/18/2024 Payment 0.00 0.00 41,035.54 0.00 11,705.76 0.00 0.00 52,741.30
3 03/11/2025 Payment 0.00 0.00 0.00 0.00 32,012.67 0.00 241,811.12 273,823.79
TOTAL PAYMENTS 0.00 0.00 55,121.91 0.00 43,718.43 0.00 241,811.12 340,651.46