Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 12/30/2024 Audit 0.00 0.00 0.00 0.00 1,128.90 0.00 272,415.10 273,544.00
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 1,128.90 0.00 272,415.10 273,544.00