Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 11/19/2024 Payment 0.00 0.00 6,978.97 0.00 5,290.88 1,110.79 309,038.91 322,419.55
2 02/25/2025 Audit 0.00 0.00 -430.58 0.00 2,006.36 -1,110.79 -2,900.54 -2,435.55
TOTAL PAYMENTS 0.00 0.00 6,548.39 0.00 7,297.24 0.00 306,138.37 319,984.00