Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 05/23/2024 Payment 0.00 0.00 1,463.90 0.00 0.00 0.00 0.00 1,463.90
2 08/21/2024 Payment 0.00 0.00 45,796.17 0.00 0.00 0.00 0.00 45,796.17
3 12/02/2024 Audit 0.00 0.00 339.37 0.00 47,581.59 0.00 405,477.97 453,398.93
TOTAL PAYMENTS 0.00 0.00 47,599.44 0.00 47,581.59 0.00 405,477.97 500,659.00