Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 09/16/2024 Payment 0.00 0.00 46,158.83 0.00 0.00 0.00 0.00 46,158.83
2 01/16/2025 Payment 0.00 0.00 40,859.82 0.00 0.00 0.00 0.00 40,859.82
3 06/30/2025 Payment 0.00 0.00 10,271.91 0.00 0.00 42,529.31 183,320.85 236,122.07
4 07/16/2025 Payment 0.00 0.00 0.00 0.00 0.00 0.00 246,914.88 246,914.88
5 08/15/2025 Audit 0.00 0.00 -1,989.32 0.00 46,508.71 -42,529.31 -8,795.68 -6,805.60
TOTAL PAYMENTS 0.00 0.00 95,301.24 0.00 46,508.71 0.00 421,440.05 563,250.00