Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 02/12/2025 Payment 0.00 0.00 4,798.80 0.00 0.00 0.00 0.00 4,798.80
2 03/14/2025 Payment 0.00 0.00 25,193.70 0.00 0.00 0.00 0.00 25,193.70
TOTAL PAYMENTS 0.00 0.00 29,992.50 0.00 0.00 0.00 0.00 29,992.50