Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 03/12/2025 Payment 0.00 0.00 41,187.34 0.00 0.00 0.00 0.00 41,187.34
2 04/09/2025 Payment 0.00 0.00 18,953.34 0.00 0.00 0.00 0.00 18,953.34
TOTAL PAYMENTS 0.00 0.00 60,140.68 0.00 0.00 0.00 0.00 60,140.68