Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/05/2024 Payment 0.00 0.00 8,328.33 0.00 0.00 0.00 0.00 8,328.33
2 07/09/2024 Payment 0.00 0.00 29,065.42 0.00 0.00 0.00 0.00 29,065.42
3 07/22/2024 Payment 0.00 0.00 20,513.58 0.00 0.00 0.00 0.00 20,513.58
4 12/20/2024 Payment 0.00 0.00 25,205.84 0.00 0.00 0.00 0.00 25,205.84
5 01/09/2025 Audit 0.00 0.00 -18,076.71 0.00 19,972.93 0.00 288,049.61 289,945.83
TOTAL PAYMENTS 0.00 0.00 65,036.46 0.00 19,972.93 0.00 288,049.61 373,059.00