Bill #
Payment Date
Type
Predesign
Spec. Study
DE Engr.
Right of Way
CN Engr.
CN Other
CN Contract
Total
1
08/20/2025
Payment
0.00
0.00
58,752.48
0.00
0.00
0.00
0.00
58,752.48
TOTAL PAYMENTS
0.00
0.00
58,752.48
0.00
0.00
0.00
0.00
58,752.48