Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 04/11/2025 Payment 0.00 0.00 29,483.21 0.00 0.00 0.00 0.00 29,483.21
TOTAL PAYMENTS 0.00 0.00 29,483.21 0.00 0.00 0.00 0.00 29,483.21