Bill # Payment Date Type Predesign Spec. Study DE Engr. Right of Way CN Engr. CN Other CN Contract Total
1 08/27/2024 Payment 0.00 0.00 0.00 0.00 0.00 40,651.17 0.00 40,651.17
2 10/10/2024 Payment 0.00 0.00 0.00 0.00 0.00 5,228.10 0.00 5,228.10
3 06/27/2025 Audit 0.00 0.00 0.00 0.00 0.00 -2,980.12 10,623.85 7,643.73
TOTAL PAYMENTS 0.00 0.00 0.00 0.00 0.00 42,899.15 10,623.85 53,523.00